Bath Addition

  • RM041001182L1.jpg(90)

    James Krengel Wins Remodeling 2004 Foundation Award for Lifetime Achievement

    For almost 40 years, James Krengel has dedicated his life to defining and teaching professionalism in the kitchen and bath industry. He built a successful example with his own company, then set out to help new designers and remodelers reach their goals. For his drive for professionalism and his...

     
  • RM041001138L3.jpg(90)

    Clever Storage for Kitchen and Bath

    My husband, Bob, and I run a design/build remodeling company in California's Silicon Valley. Many of our customers are engineers, so they expect cabinets to be highly functional and designed to fit their specific needs, in addition to being beautiful. Our in-house designers work closely with local...

     
  • RM040901100bL1.jpg(90)

    Honorable Mention: Interior Oasis

    Designer Ramina Kashani transformed an outdated guest bathroom into this serene, spa-like retreat by stealing just a little space from an adjacent closet and putting her mind to work.

     
  • RM040901096L1.jpg(90)

    Honorable Mention: Bath and Beyond

    Talented subcontractors, cooperative homeowners, efficient production — these may be important to the success of a remodel. Even more important to unlocking a room's potential, however, is a fertile imagination.

     
  • RM040901092L1.jpg(90)

    Merit Award: Clear and Simple

     
  • RM040701096bL1.jpg(90)

    Ugliest Bathroom Gets a Makeover

    When designer Barbara Schmidt saw the winner of American Standard's Ugliest Bathroom Contest, she laughed out loud. The master bathroom had a 1970s décor that included shag carpeting, foil wallpaper, a plastic vanity top, and hanging globe lights. When the owner of bstyle in Minneapolis recovered...

     
  • Cost vs. Value 2003 - Master Suite

    Master Suite Project Description: (MIDRANGE) On a house with two or three bedrooms, add a 24-by-16-foot master bedroom suite over a crawl space. Include walk-in closet/dressing area, whirlpool tub in ceramic tile platform, separate 3-by-4-foot ceramic tile shower, and double-bowl vanity with...

     
  • Cost vs. Value 2003 - Bathroom Remodel

    Bathroom Remodel Project Description: (MIDRANGE) Update an existing bathroom that is at least 25 years old. Replace all fixtures to include standard-sized tub with ceramic tile surround; toilet; solid-surface vanity counter with integral double sink; recessed medicine cabinet; ceramic tile floor;...

     
  • Cost vs. Value 2003 - Bathroom Addition

    Bathroom Addition Project Description: (MIDRANGE) Add a full 6-by-8-foot bath to a house with one or one and a half baths. Locate within existing footprint near bedrooms. Include cultured-marble vanity top, molded sink, standard tub/shower with ceramic tile surround, low-profile toilet, general and...

     
  • RM040601096L1.jpg(90)

    Bathing Beauties

    The four winners of REMODELING's Bath Design Contest offer different approaches to the same goal: updating a tired family bathroom.